PROJECT: Henderson Airport Drainage Improvements
OWNER: Henderson Airport Board
COMPLETION DATE: 2015
COMMENTS: The project is designed to improve drainage for a planned airport expansion. The existing storm water drainage along the taxiway will be extended to Pond Creek. Stream widening is planned. A one step removal process will be conducted and no fill will be placed in the floodplain. Therefore this project will have a negligible flood impact and no backwater effect. The end result of the project will be improved storm water removal from the airport.

PROJECT: City of Earlington Sewer Improvement/Rehabilitation Project
OWNER: City of Earlington, KY
COMPLETION DATE: 2015
COMMENTS:  RJA’s responsibilities include funding assistance, design, permits, encroachments, construction management and resident inspection.

PROJECT SCOPE: This project will make improvements to the existing sewer collection system by finding, repairing and/or replacing damaged sewer mains and manholes within the system. The project will reduce infiltration and inflow (I/I) by a minimum of 30% and reduce the gallons per day being treated by the Madisonville WWTP. Project will concentrate on the clay pipe that is known to be located on the north side of town. This project will replace approximately 19,000 linear feet of clay tile pipe with 8-inch and 10-inch PVC pipe. As more detailed design is done, some HDPE pipe may be utilized with a technique called pipe bursting rather than all open trench work and installing PVC. Pipe bursting can be done under streets more cheaply than open trench because the asphalt does not need to be replaced.

PROJECT BENEFIT: The project will reduce I/I which will reduce system overflows. This project will create a cleaner environment for the City of Earlington.

PROJECT: Henderson River Port Authority—Preliminary Study for Drainage Improvements
OWNER: City of Henderson, KY
COMPLETION DATE: 2014
COMMENTS: RJA completed a drainage study of the River Port Authority property and adjacent properties to improve overall drainage in this relatively flat area. RJA’s hydrologic analysis revealed that drainage control could be achieved with improved ditches, culverts and retention basins. The total estimated cost of this project would be $500,000.

PROJECT: Pogue Investments, LLC
OWNER: Mark Pogue, President
COMPLETION DATE: 2013
COMMENTS: RJA completed the site design, permits and construction inspection from Kentucky Transportation and Kentucky Division of Water, survey and construction inspection. The design included highway ROW access, storm water controls, parking, lighting and general site layout.

PROJECT: Dawson Brings Airport Drainage Improvements
OWNER: City of Dawson Springs, KY
COMPLETION DATE: 2012
COMMENTS: RJA completed the survey, design (including hydrologic analysis) and construction inspection of the airports drainage improvements. The design included retention basin, new 42 inch CMP pipe arch and 3,900 feet of stream bank stabilization.